WVB East End Partners will commence roadway shoulder sweeping operations on the evening of Thursday, September 14, 2017 starting at 7:00 pm. Operations will be conducted between MM 8.78 on Indiana SR 265 and MM 37.8 on Kentucky 841 in both directions of travel. Work will include the ramps at Exits 10 and 11 in Indiana. Work will conclude by 6:00 am on Friday, September 15, 2017.
Personnel and equipment will be present on the inside and outside shoulders of the roadway and therefore, motorists are asked to use caution in the area during the sweeping period.